– Adventure playground has been opened in Taraz

  • Complex had been built for young residents of the city from 1 to 12 years old
  • Installed gymnastic, sports and gaming facilities, attractions, swings, balance beams, carousels, slides, special play complexes for exceptional children
  • An injury-proof rubber coating was laid
  • Comfortable benches and rubbish bins were placed
  • Total area of the complex is more than 1500 sq. m.

The sports facility was built entirely at the expense of the Foundation and donated to the city.
The project cost amounted to 44.5 million KZT.

– A children’s inclusive playground was opened in Nur-Sultan
The project was carried out jointly with the Akimat and Sberbank of Kazakhstan. The cost of the facility is 77,330,500 KZT.

The total amount of funds spent on the implementation of the Sports project in 2021 amounted to 121,794,500 KZT.