1) A complete reconstruction of the Almaty “Children’s Rehabilitation Center “Baldauren” for children with chronic diseases of the nervous system and respiratory organs was carried out. A major overhaul was carried out in all blocks, the original design of the premises was carried out, new furniture, appliances and equipment were purchased and installed.

144,000,000 tenge spent

2) The construction of a secondary school in the city of Astana is at the completion stage.

The four-story school has a capacity of 750 students. The building area is about 10,000 sq.m. The area of sports and play areas is 2,926 sq.m.

About 3,250,000,000 tenge spent