Construction of Social Dormitory. Stages

To the present time, the works of engineering and geological research on the construction site of Social Dormitory for boarding school leavers have been completed.

16 exploration wells were drilled, in the result of which 26 soil samples were selected for laboratory evaluations of their qualities and composition.

Field documentation of drilled wells and results of laboratory investigations became the basis for drawing of the technical report of engineering and geological research, prepared by one of the contractors.

26.08.2015
20.09.2021
Repair works at Meyirim Center

In 2017, the Saby Foundation built the Meyirim Youth Social Adaptation Center for graduates of orphanages in Aktobe city. The center consists of four two-storey residential townhouses with 80 apartments and the administrative…

Social hostel for graduates of orphanages
19.10.2020
Business trip to Aktobe

We provide sustainable support for all projects implemented by our Foundation. One of them is the Center for Social Adaptation of youth “Meirim”, built by the Saby Foundation in 2017 in Aktobe. A business trip to…

Social hostel for graduates of orphanages
09.07.2020
The news from Center for Social Adaptation of…

We want to share the news from our Center for Social Adaptation of Youth Meyirim in Aktobe. More than 100 pupils from 18 to 29 years old - graduates of special boarding institutions, who, after graduating from orphanages,…

Social hostel for graduates of orphanages