«SPORT-HEALTH-ACHIEVEMENTS»
Project Purpose:
1. To create conditions for pupils of child welfare social institutions in Kazakhstan to do exercises and to go in for sports, and to develop Olympic and national sports as well as peoples’ games;
2. To form a healthy life and principles of an active longevity among pupils;
3. To enhance occupation of children and the youngsters by providing sports leisure activities for the purpose of offence prevention.
Scenario of the Project Implementation:
1. To build sports-grounds and tot-lot areas equipped on an up-to-date basis at child welfare social institutions;
2. To involve pupils in systematic exercises and sports;
3. To activate interaction between the physical education & sports associations (including federations) and sports clubs and the pupils of child welfare social institutions.
Problem Definition:
Currently Kazakhstan has received increasing attention to the development of sports both generally around the country and in the educational system. However only 56.5 % of general education institutions of the Republic have standard sports halls and 14.9 % of once have sports halls duly adapted. A scope of exercises done at secondary education institutions is 3 - 4 times less than the applicable standards require. To reach a scheduled and scientifically proven level of physical activity, one should increase the number of exercises and provide a training process with sports equipment.
Unfortunately, out-of-class health & fitness and sports & mass activities during extracurricular hours have failed to develop. The number of children and the youngsters, who are subject to different cold-related and chronic diseases is still increasing owing to a low physical activity.
The importance of sport for pupils of child welfare social institutions is particularly difficult to overestimate. Indeed, often such children have nothing to occupy their leisure with. As a result, there is a dawdle, which leads to disappointment, hooliganism and even immorality. To engage children especially upperclassmen in useful things after studies is becoming an important task. And sport promotes in the solution of many problems.
Primary Tasks:
1. Physical education of preschool and primary school-aged children
Task Definition:
The basic vital motor skills develop at the tender age of children, a child learns to properly walk, sit, stand, do the simplest exercises, orientate itself in space, take physical conditioning procedures, and gets into the habit of everyday physical exercises and sports activities, which are the basis of a healthy life. Arrangements for physical education of children require exercises with them by way of games, as a rule, in the open air, and a constant updating of the content thereof. Exercises are to be based on a various physical training, which increase functional capabilities of children and develop all physical functions of the human body. The leading scientists in pediatry and physical training & sport recommend physical activity for not less than 10 – 12 hours per week for the said age group.
The primary directions in the solution of the task are as follows:
- to set up tot-lot areas “Ksil” at child welfare social institutions with more than 15 preschool and primary school-aged children to do exercises outdoors (Organization in Charge – Saby Charitable Foundation);
- to develop and introduce training and game programs for physical education of preschool and primary school-aged children at institutions (to be performed by the administration of orphanages and boarding schools);
2. Physical education of senior school-aged children
Task Definition:
Physical education is to promote development and improvement of children’s basic motion functions, their physical development and health, and education of a conscious need in a healthy life.
Physical education of senior school-aged children is to develop their high need in systematic physical exercises and sports activities. It necessary to introduce extracurricular exercises subject to the interests of children in different sports and systems of exercises. During classes, one should teach to rationally use factors of nature, to combine work with rest, to give a grounding of physical training, self-massage and safety rules, combination of volumes and intensity of exercise loads, a proper performance of exercises and succession thereof, and to give necessary theoretic knowledge about the physiological make-up of the body, and the hygiene of exercises. A recommended scope of active exercises and sports activities for children of this age category is not less than 8 - 10 hours a week.
The primary directions in the solution of the task are as follows:
- to build, at child care social institutions, up-to-date sports grounds equipped, on a multi-purpose basis, to go in for different sports (in particular, five-a-side, voleyball, basketball, handball, and court tennis) (Organization in Charge – Saby Charitable Foundation);
- to improve out-of-school forms of arrangement for physical training for a further changeover from the classes in physical education to the trainings as per particular sports subject to the interests of pupils and the development of their physiological make-up (Organizer – Saby Charitable Foundation) (to be performed by the administration of orphanages and boarding-schools);
- to ensure that physical exercises and sports activities are popularized by involving famous sportsmen, champions, Merited Sports Masters and leading coaches by pupils (Organization in Charge – Saby Charitable Foundation);
- to select promising children to get a further sports education to replenish national teams as per particular sports (Organization in Charge – Saby Charitable Foundation).
Project Financing:
The project will be financed by voluntary contributions of benefactors through the Non- Commercial Organization “Saby Charitable Foundation”.
Expectations:
1. Establishment of healthy life principles among the children and the youth of child care social institutions.
2. Increase in the number of pupils, who actually engage in exercises and sports activities and, as a result, decrease in the morbidity rate.
3. Decrease in the number of offences among the the younger generation.
4. Increase in the promising sports reserve of candidates to the R.K. national teams from among the pupils of child care social institutions.
Milestones:
The project has been operating since 2002;
49 sports facilities were built, repaired and equipped in 30 institutions in 14 regions of Kazakhstan (Almaty, Taldykorgan, Semey, Ust-Kamenogorsk, Temirtau, Kyzylorda, Petropavlovsk, Aktobe, Atyrau, Alga, Kaskelen, settlement ofBalpyk Bi in Almaty region, village of Makhambet in Atyrau region, Taraz), of which:
- multifunctional sports grounds – 23;
- sports halls – 4;
- playgrounds – 20;
- fitness center - 2.
Public Institution “Specialized Complex «Zhanuya»
6. A sports ground to play five-a-side and court tennis with a “synthetic grass”coverage of 800 m2 was put in commission in May of 2007.
7. A sports ground of 700 m2 to play volleyball, basketball and court tennis was put in commission in May of 2007.
Public Institution “Orphanage № 1”, City of Almaty
1. A sports ground to play five-a-side with a “synthetic grass”coverage of 600 m2 was put in commission in April of 2008.
2. A sports ground of 500 m2 to play volleyball, basketball, court and table tennis was put in commission in April of 2008.
3. A playground «Кsil» of 40 m2 was put in commission in May of 2009.
Public Institution “Almaty Regional Orphanage № 1”
8. A sports hall of 197 m2 with PVC coverage was put in commission in May of 2009.
9. A playground «Кsil» of 150 m2 was put in commission in May of 2009.
Orphanage «Ainalayin», Town of Taldykorgan
10. A multi-purpose sports ground of 450 m2 to play five-a-side, basketball, volleyball and court tennis with a special coverage and a possibility to fill in a skating rink in wintertime was put in commission in September of 2009.
Boarding-school № 1 for orphaned children and those children, who were left without the care of their parents, Town of Kyzylorda
11. A sports hall of 197 m2 with PVC coverage was put in commission in October of 2009.
12. A sports ground of 600 m2 to play five-a-side with a special coverage and a possibility to fill in a skating rink in wintertime was put in commission in November of 2009.
13. A sports ground of 500 m2 to play volleyball, basketball, court and table tennis was put in commission in November of 2009.
14. A playground «Кsil» of 150 m2 was put in commission in October of 2009.
Child Welfare Antituberculous Sanatorium “Chimbulak”, Almaty Oblast
15. A playground «Кsil» of 300 m2 was put in commission in April of 2010.
Kaskelen Boarding School
16. Commissioning of a Children’s Playground “Ksill” in 2010 with total area of 200 м2.
17. Commissioning of a multi-sports ground in 2010 for playing mini-football, basketball, volleyball with special floor-coating that makes it possible to use it as a skating-rink in winter with total area of 450 м2.
Special boarding school №2 of Petropavlovsk
18. A playground «Кsil» of 300 m2 was put in commission in May of 2011.
Ust-Kamenogorsk Children's orphanage "Umyt"
19. Multi-sports ground for playing mini-football, basketball, volleyball with special floor-coating that makes it possible to use it as a skating-rink in winter with total area of 450 м2 is commissioning in June of 2011.
Danashym Physics-Mathematics School, Almaty
20. Children’s playground “Ksil” with an area of 200 m2 was put into operation in August 2011
Hope House, Almaty
21. Children’s playground “Ksil” with an area of 300 m2 was put into operation in September 2011.
Youth House, Almaty
22. Professional field for mini-football with an area of 800 m2 equipped with special safe “artificial grass” cover and contour floodlight was put into operation in October 2011.
Boarding-school, Semei
23. Multi-sports ground with an area of 450 m2 for playing mini-football, basketball, volleyball with special safe “artificial grass” cover and contour floodlight was put into operation in August 2012.
Regional Rehabilitation Center, Alga, Aktobe Oblast
24. A playground «Кsil» of 150 m2 was put in commission in August 2012.
Regional Special School – boarding, Temirtau
25. Multi-sports ground with an area of 450 m2 for playing mini-football, basketball, volleyball with special safe “artificial grass” cover and contour floodlight was put into operation in September 2012.
Children’s House of Kyzylorda
26. A playground «Кsil» of 200 m2 with special safe “artificial grass” cover and contour floodlight was put into operation in October 2012.
Public institution "Orphanage № 8 family type" in Semey
27. Multi-sports ground with an area of 450 m2 for playing mini-football, basketball, volleyball with special safe “artificial grass” cover and contour floodlight was put into operation in June 2013.
Public institution "Boarding School № 3 for visually impaired children" in Semey
28. A playground «Кsil» of 200 m2 was put into operation in June 2013.
Public institution "Special boarding school № 4 for the hearing-impaired children" in Semey
29. Multi-sports ground with an area of 450 m2 for playing mini-football, basketball, volleyball with special safe “artificial grass” cover and contour floodlight was put into operation in July 2013.
‘The House of Youth’ in Almaty
30. Exercise equipment, such as bike, treadmill and cardio-vascular machine, was donated for the gym in June 2014.
Aktobe Regional Youth House
31. Children playground with special injure-safe rubber coating with total area of 525 sq.m. was put in commission in August 2015.
Aktobe Special School No 7
32. Multifunctional fenced playground with total area of 480 sq.m. for futsal, basketball, volleyball with special injure-safe rubber coating and outline searchlight was put in commission in September 2015.
Adaptation Center for Minors of North-Kazakhstan region in Petropavlovsk
33. Children playground with a special injury prevention coating with a total area of 144 sq. m was constructed in June 2016
Aktobe Regional Special (Correctional) Boarding School - College for Children with Hearing Impairment, Aktobe
34. Children playground of Correction Special Boarding School with a special injury prevention coating with a total area of 296 sq. m was constructed in August 2016
Children's home No. 1 in Almaty
35. The capital repair was carried out with the replacement of concrete base and laying of rubber cover with a total area of 820 sq. m, in September 2016.
Center for Social Adaptation of Youth "Mejirim", Aktobe
36. Multifunctional sports ground, total area of 756 sq.m., June 2017
37. The ground of the workout and street out, a total area of 33 sq. m., June 2017
38. Equipped a gym, a total area of 67 sq. m., June 2017. Atyrau city center
39. Adventure playground, the total area of 2000 sq.m., August 2017
Gymnasium school No. 174 in Almaty
40. Multifunctional sports ground, total area of 312 sq.m., September 2017
41. Children's playground, a total area of 250 sq.m., September 2017
42. 2 gym halls of 289 sq.m., September 2017 43. Football field, the total area of 2496 sq.m., September 2017
In June 2018, a children’s playground was built, with a total area of 150 sq. m in the Municipal Public Utilities Institution Umit Day Care Center for Children with Disabilities in the settlement of Balpyk Bi in Almaty region;
In September 2018, a multifunctional sports and play structure was built, including: playground, basketball, volleyball, football grounds, as well as sports and workout and street out areas, with a total area of 1,500 sq. m. in the village of Makhambet in Atyrau region;
In October 2018, 2 exercise machines for the sports halls were donated to the Meyirim Center for Social Adaptation of Youth.
Specialized child care center of Kyzylorda - jungle gym for special needs children was installed, swing in the form of socketand stand for ball game.